Progressing with the Technical Assistance for the Electrification Works on the Córdoba–Málaga Railway Line (Line 430).

Our CONSULTRANS Site Supervision and Works Control team continues to oversee the execution of the works under the “Construction Design Project for the Replacement of Catenary Droppers between Bobadilla and Álora”, an initiative aimed at renewing and upgrading railway electrification installations.

Following the formal acceptance of the first two sections, we are currently working on the second milestone, which involves supervising the renewal and upgrading works to bring the electrification installations into compliance with NAE 300 at Gobantes, El Chorro, Las Mellizas and Álora stations, as well as along the railway sections between El Chorro and Álora.

Key activities carried out include:

On-site review of the proposed setting-out to verify its validity and compliance with applicable regulations.
Monitoring the construction of new cylindrical foundations for the installation of catenary masts.
Verification of the complete installation of masts, including new cantilevers, stay-wire adjustments, bracing, suspensions, contact and catenary wire installation, equipotential droppers and independent mechanical tensioning equipment.
Supervision of the installation and integration of new remotely controlled disconnectors, earthing equipment, surge arresters and VLD devices.

At CONSULTRANS, we bring the technical rigour and expertise required to ensure the successful execution of these works and contribute to the modernisation of an essential railway infrastructure.
We continue to put our knowledge and experience at the service of the modernisation and improvement of our railway network.